We reported on 3/10 that infrastructure and roads to ports from our Foraction plant had been damaged; and that luckily we had found a work-around, albeit 4-times as long, which would increase inland freight rates and cost of fiber. The good news today is that our normal routes have been repaired (or are being repaired), and WindsorONE products will no longer incur the additional freight cost.
There are still many factors, however, that could increase the cost of our products; we’re gathering as much information as possible now, to see exactly if, how or when our cost structure might be impacted. We should be able to provide more Insights into pricing come Monday of next week.